Heavy Lifting

Once again, I was in the New York Harbor area, aboard a tugboat with the legendary Captain Silva. This time we tended to a few barge shifts than returned to Staten Island where there was a heavy lift operation underway. DonJon Marine moved in with their Chesapeake 1000 floating crane. This unit proceeded to lift a newly constructed floating drydock from the shipyard into the water. Here is a photo of the scene.

liftaThis can be a tricky procedure, full of pitfalls if the weather changes, something goes wrong, or simple human error. However, the job went easily enough. The drydock was lifted, the crane pivoted around, and then the drydock was set into the water like a dozen eggs in the fridge. It takes copious amounts of cooperation between the people on the ground and the fellow operating the crane, who may not be able to see everything, including obstacles in the way.

Just another way to travel and things to do. Great story material, too.

About these ads

The URI to TrackBack this entry is: http://bentpage.net/2009/06/10/heavy-lifting/trackback/

RSS feed for comments on this post.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 239 other followers

%d bloggers like this: